Home · Portfolio

Built &
shipped.

ENGINEERINGRoads · Buildings · Water · Power · Mining

SOFTWAREIdentity · KYC · Fraud · Analytics · API

RANGE₦20M – ₦300M+ (engineering) · Production platforms (software)

2,847 VERIFICATIONS TODAY 99.7% MATCH ACCURACY 1.8s AVG RESPONSE PLT-001 · 2024LIVE ENIVERIFY · IDENTITY VERIFICATION PLATFORMEXAMINATION SECTOR
SOFTWARE · IDENTITY VERIFICATION

Eniverify — Identity Verification Platform

Purpose-built for exam administrators. Biometric face-match, NIN/BVN validation, liveness detection, real-time fraud flagging. 99.7% accuracy, <3s response.

EXAM SECTOR99.7%LIVE
PRJ-001 · 2019 SKILL ACQUISITION CENTRE · EKET · AKWA IBOM COMPLETED CLIENT: PRES. AMNESTY PROGRAMME
ENGINEERING · FEDERAL · ₦60M

Skill Acquisition Centre — Eket, Akwa Ibom

Ground-up construction for the Presidential Amnesty Programme. Delivered in 90 days, ₦60M, zero variations.

₦60M90 DAYS2019
PHOTO ATTESTATION ENGINE ① Hash document ② Compare registry ③ Validate biometric ④ Issue attestation VALID PLT-003 · 2025PRODUCTION CREDENTIAL ATTESTATION · TRF VERIFICATIONEXAMINATION BODIES
SOFTWARE · CREDENTIAL ATTESTATION

TRF Attestation & Credential Verification

Cryptographic credential engine. Hash-based document integrity, biometric binding, tamper-evident audit trails. Real-time API verification.

EDUCATIONREAL-TIMEPRODUCTION
0+0000+500 1+0001+500 2+000 PRJ-002 · 2018 COMPLETED RURAL ROAD · GOMBI / HONG · ADAMAWA
ENGINEERING · FEDERAL · ₦49.5M

2 km Rural Road & Drainage — Gombi/Hong

Federal constituency road in Adamawa State. 2 km with drainage, 12-week delivery, BCDA contract.

₦49.5M12 WEEKSCOMPLETED
FRAUD ATTEMPTS TODAY 47 BLOCKED AUTOMATICALLY 44 FLAGGED FOR REVIEW 3 DETECTION RATE 93.6% PLT-004 · 2025LIVE REAL-TIME ANALYTICS · FRAUD INTELLIGENCEDECISION SUPPORT
SOFTWARE · FRAUD INTELLIGENCE

Real-Time Fraud Analytics Dashboard

Operational intelligence: live fraud tracking, automated blocking metrics, detection analytics, trend analysis.

ANALYTICSREAL-TIMELIVE
150 m³ RETICULATION · 22 km BH-01BH-02 BH-03BH-04 BH-05BH-06 PRJ-004 DELIVERED NNOBI REGIONAL WATER SUPPLY · IDEMILI
ENGINEERING · WATER SUPPLY

Nnobi Regional Water Supply — Anambra

22 km reticulation, 150 m³ treatment plant, 10 boreholes, 5 elevated tanks, 6 km roads, 5 sub-stations.

22 KM10 BHDELIVERED
POST/api/v1/verify Content-Type: application/json Authorization: Bearer •••••• { "nin": "12345678901", "face": "base64...", "exam": "IELTS-2026-Q2", "centre": "BC-LAGOS-VI" } → 200 OK{ "match": true, "score": 0.987, "ms": 1847 } PLT-005 · 2024PRODUCTION REST API · DEVELOPER PLATFORMMULTI-TENANT
SOFTWARE · API PLATFORM

REST API & Developer Platform

Multi-tenant REST API: OAuth 2.0, rate limiting, SDKs, documentation. Third-party verification integration.

MULTI-TENANTREST APIPRODUCTION
9.3m CREST LENGTH 404m PRJ-006 DELIVERED SABKE IRRIGATION DAM · FED. MIN. WATER RES.
ENGINEERING · IRRIGATION

Sabke Irrigation — Earth Dam

9.3 m earth dam, 404 m crest, 303,000 m³ reservoir. RC spillway with USBR Type III stilling basin.

303,000 m³DAMDELIVERED

Your project could be
the next one
here.

LET'S BUILD SOMETHING
+234 813 110 1943info@eniway.ng
Lagos, Nigeria
Start a project